Drones & Laser Scanning
Modern mine surveying uses drones (UAVs), photogrammetry, LiDAR and mobile laser scanning. Learn ground sample distance (GSD), image footprint and overlap, flight planning, ground control points (GCPs) and RTK/PPK, point clouds and accuracy checks, and applications in pits, stockpiles and underground.
A drone can survey an entire pit in an hour — work that once took a survey crew days, often in hazardous areas near highwalls. Laser scanners capture millions of points per second, producing detailed 3D models for geotechnical mapping, reconciliation and digital twins.
An analogy
Photogrammetry is like your two eyes: seeing a scene from slightly different positions lets the brain (software) reconstruct depth in 3D.
Photogrammetry
Overlapping images (typically 75 % front, 65–70 % side) are processed with structure-from-motion software (Pix4D, DJI Terra, Agisoft) into point clouds, orthomosaics and DTMs. GSD sets the detail — ≈ 2–3 cm is typical for mining.
Accuracy
Ground control points (surveyed targets) or RTK/PPK GNSS on the drone georeference the model. Check points not used in processing measure accuracy (RMSE ≈ 1–3 × GSD). Vegetation and dust reduce quality.
LiDAR and scanning
Laser scanning measures distance directly: terrestrial scanners for highwalls, drone LiDAR through vegetation, mobile/SLAM scanners for underground drives and stopes, and fixed scanners monitoring stockpiles and slopes continuously.
Advanced uses
Automated geotechnical mapping (joint orientations from point clouds), change detection for slope monitoring, digital twins updated daily, and autonomous drones flying underground (BVLOS in stopes) for CMS-style inspections.
Formulas
- Ground sample distance:
GSD = S_w × H / (f × N_px) - Footprint:
W = GSD × N_px (across), L = GSD × N_py (along) - Spacing with overlap:
Photo spacing = L (1 − front overlap), line spacing = W (1 − side overlap)
Worked example: GSD
Given: Sensor 13.2 mm, f = 8.8 mm, 5472 px; H = 100 m
Find: GSD and footprint.
- GSD = 13.2 × 100/(8.8 × 5472) = 0.0274 m = 2.74 cm
- Footprint = 0.0274 × 5472 = 150 m × (0.0274 × 3648 =) 100 m
Answer: 2.7 cm GSD, 150 × 100 m footprint
Worked example: Photo spacing
Given: Footprint 150 × 100 m; Front overlap 75 %, side 70 %
Find: Spacing.
- Along track: 100 × 0.25 = 25 m
- Line spacing: 150 × 0.30 = 45 m
Answer: Photo every 25 m, flight lines 45 m apart
Common mistakes
- Wrong: Flying without ground control or RTK. — Right: Georeference and verify with check points.
- Wrong: Too little overlap. — Right: Insufficient overlap causes gaps and distortion.
Applications
- Pit and dump surveys: Weekly volumes and design conformance.
- Highwall mapping: Joint orientations and rockfall hazards.
- Underground scanning: SLAM scans of drives and stopes.
Key takeaways
- GSD = S_w H/(f N_px).
- Plan overlap and spacing.
- Use GCPs or RTK/PPK and check points.
- LiDAR/SLAM for walls and underground.
Going further
- Automated discontinuity mapping: Joint sets from point clouds.
- BVLOS operations: Beyond-visual-line-of-sight approvals.
- Digital twins: Daily updated 3D mine models.