Additive Manufacturing

Additive manufacturing builds parts layer by layer from digital models. Learn the seven ISO/ASTM process families, metal powder-bed fusion, DED and binder jetting, energy density, supports, post-processing and design for AM.

Instead of removing material, additive manufacturing (AM) adds it only where needed. It builds complex internal channels, lattices and organic shapes impossible to machine or cast — rocket engine injectors, lightweight brackets, custom implants, conformal-cooled moulds.

Industrial AM is a serious production technology, but it has its own physics, defects and design rules.

An analogy

Building a loaf of bread slice by slice from the bottom up — each slice exactly the right shape, so any internal cavity is possible.

The seven process families (ISO/ASTM 52900)

Each builds layers differently.

Metal powder-bed fusion

A laser scans each layer of 20–60 µm powder in inert gas. Parameters (power, speed, hatch, layer) set energy density: too low leaves lack-of-fusion pores, too high causes keyhole pores and spatter. Parts are stress-relieved, removed from the plate, supports cut off, often HIPed and machined.

Design for AM

Exploit topology optimisation and lattices, consolidate assemblies into one part, add conformal channels. Respect limits: overhangs below ~45° need supports, minimum wall and hole sizes, powder removal paths, and anisotropy (weaker in build direction for many processes).

Qualification and economics

Residual stresses, distortion, porosity and surface roughness must be controlled; aerospace and medical parts need material and process qualification, in-situ monitoring (melt-pool cameras) and CT inspection. AM wins for low volumes, complexity and performance; conventional processes still win for simple, high-volume parts.

Formulas

Worked example: Energy density

Given: P = 200 W, v = 1000 mm/s; h = 0.1 mm, t = 0.03 mm

Find: E_v.

Answer: 66.7 J/mm³ (typical for 316L/AlSi10Mg windows)

Worked example: Build height

Given: Part 90 mm tall; Layer 30 µm, recoat 8 s, scan 25 s per layer average

Find: Layers and build time.

Answer: 3000 layers, ≈ 27.5 h

Common mistakes

Applications

Key takeaways

Going further